Exam 17: Spreadsheet Modeling: an Introduction
Exam 1: Introduction to Operations Management132 Questions
Exam 2: Operations Strategy and Competitiveness135 Questions
Exam 3: Product Design and Process Selection128 Questions
Exam 4: E-Commerce and Supply Chain Management139 Questions
Exam 5: Total Quality Management141 Questions
Exam 6: Statistical Quality Control136 Questions
Exam 7: Just-In-Time and Lean Systems137 Questions
Exam 8: Forecasting138 Questions
Exam 9: Capacity Planning and Facility Location139 Questions
Exam 10: Facility Layout139 Questions
Exam 11: Work System Design132 Questions
Exam 12: Independent Demand Inventory Management137 Questions
Exam 13: Aggregate Planning104 Questions
Exam 14: Resource Planning133 Questions
Exam 15: Scheduling127 Questions
Exam 16: Project Management134 Questions
Exam 16: Spreadsheet Modeling: an Introduction137 Questions
Exam 17: Spreadsheet Modeling: an Introduction133 Questions
Exam 18: Waiting Line Models132 Questions
Exam 19: Master Scheduling and Rough-Cut Capacity Planning69 Questions
Select questions type
Capital Co. is considering five different projects. Define Xi as a binary (0-1)variable that equals 1 if project i is undertaken and 0 otherwise, for i = 1,2,3,4,5. Which of the following represents the constraint(s)stating that projects 2, 3, and 4 cannot all be undertaken simultaneously?
Free
(Multiple Choice)
4.9/5
(28)
Correct Answer:
D
It is good practice to ____________ the units and the __________ represented by objective function.
Free
(Short Answer)
4.9/5
(36)
Correct Answer:
include, quantities
What is the optimal solution (X, Y, Z)to the following linear program?
Max 2X + 4Y + 6Z
Subject to
Z ? 0
X + Y + Z ? 20
X, Y, Z ? 0
Free
(Multiple Choice)
4.9/5
(31)
Correct Answer:
C
Describe what steps one should use if the Solver Results box says, "The conditions for Assume Linear Model are not satisfied"?
(Essay)
4.7/5
(36)
Given a Linear Program with a minimization objective, the optimal objective function value may decrease if a ≥ constraint is added to the program.
(True/False)
4.8/5
(27)
What are the four steps to setting up an optimization problem with Excel Solver?
(Essay)
4.8/5
(31)
In the "Solver Options" box of Excel Solver, what should be checked to ensure that the Simplex Method is used to solve the model?
(Multiple Choice)
4.9/5
(36)
The algebraic formulation of an optimization problem states the decision variables, objective function, and constraints in algebraic form.
(True/False)
4.8/5
(36)
All mathematical programs should include non-negativity constraints.
(True/False)
4.8/5
(38)
Car Phones, Inc. (CP), sells two models of cell phones: Model A and Model B. Records show that 3 hours of sales time are used for each Model A cell phone that is sold and 5 hours of sales time for each Model B telephone. A total of 600 hours of sales time is available for the next 4-week period. In addition, management planning policies call for minimum sales goals of 100 units for Model A and 80 units for Model B. Furthermore, the number of phones that CP makes is limited by its critical process, the plastic injection molding machine, which can produce a maximum of 1500 phones per 4-week period. CP makes a $40 profit contribution for each Model A sold and a $50 profit contribution for each Model B sold. Formulate a Linear Program that can be used to determine the optimal production amounts CP for the next 4-week period.
(Essay)
4.8/5
(36)
The process of thinking about a problem in a structured way often leads to ________ to making a better decision.
(Short Answer)
4.8/5
(34)
If all constraints are not fully consumed, the final result is not an optimal solution.
(True/False)
4.9/5
(36)
How can the following Linear Program be characterized?
Min X + 2Y
Subject to
X ? 20
Y ? 5
X, Y ? -40
(Multiple Choice)
4.8/5
(32)
Solver's Changing Cells corresponds to the ________ in the algebraic model.
(Short Answer)
4.8/5
(33)
A formulation is a formal, ____________ statement of a constrained optimization problem
(Short Answer)
4.7/5
(35)
If a firm is using a linear program to determine production amounts of its chairs and tables, which of the following constraints must be in the model?
(Multiple Choice)
4.7/5
(35)
How can the following Linear Program be characterized?
Max X + Y
Subject to
X ? 34
X, Y ? 0
(Multiple Choice)
4.9/5
(27)
Suppose that a firm makes gears (G)and axles (A). Each gear requires 15 minutes of labor and each axle requires 30 minutes of labor. One thousand hours of labor are available. How should the labor constraint(s)be written?
(Multiple Choice)
4.8/5
(33)
Consider a mathematical program where Xi represents the amount produced of item i (i = 1,2,3,4), and you want the total amount produced over all four items to equal either 100, 120, 140, or 200. If you define qi as binary (0-1)variables (i = 1,2,3,4)and add the constraint q1 + q2 + q3 + q4 = 1, what other constraint do you need to add to the program?
(Multiple Choice)
4.9/5
(47)
It is possible to solve a 2-variable problem with a __________________ to find an optimal solution.
(Short Answer)
4.8/5
(36)
Showing 1 - 20 of 133
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)