Exam 19: Master Scheduling and Rough-Cut Capacity Planning
Exam 1: Introduction to Operations Management132 Questions
Exam 2: Operations Strategy and Competitiveness135 Questions
Exam 3: Product Design and Process Selection128 Questions
Exam 4: E-Commerce and Supply Chain Management139 Questions
Exam 5: Total Quality Management141 Questions
Exam 6: Statistical Quality Control136 Questions
Exam 7: Just-In-Time and Lean Systems137 Questions
Exam 8: Forecasting138 Questions
Exam 9: Capacity Planning and Facility Location139 Questions
Exam 10: Facility Layout139 Questions
Exam 11: Work System Design132 Questions
Exam 12: Independent Demand Inventory Management137 Questions
Exam 13: Aggregate Planning104 Questions
Exam 14: Resource Planning133 Questions
Exam 15: Scheduling127 Questions
Exam 16: Project Management134 Questions
Exam 16: Spreadsheet Modeling: an Introduction137 Questions
Exam 17: Spreadsheet Modeling: an Introduction133 Questions
Exam 18: Waiting Line Models132 Questions
Exam 19: Master Scheduling and Rough-Cut Capacity Planning69 Questions
Select questions type
What is the portion of the MPS called that lies between the current time and the demand time fence?
Free
(Multiple Choice)
4.9/5
(39)
Correct Answer:
B
The MPS is said to be ________________________ between final assembly and cumulative manufacturing lead times.
Free
(Short Answer)
4.8/5
(44)
Correct Answer:
slushy
The ______ _____ shows how many products or services are planned for each time period.
Free
(Short Answer)
4.8/5
(31)
Correct Answer:
aggregate plan
Consider the following partial MPS record. Beginning inventory is 0 units. The firm uses a fixed order quantity of 60 units. Fill out the last two rows of the table.


(Essay)
4.8/5
(37)
Consider the following partial MPS record. Beginning inventory is 120 units. When should the first MPS shipment be scheduled?


(Multiple Choice)
4.8/5
(37)
In the "slushy" portion of the MPS, changes in the product mix are possible, but changes needing additional resources are not.
(True/False)
4.9/5
(41)
A primary objective of the master production schedule is to achieve the desired customer service level.
(True/False)
4.7/5
(31)
Which of the following is not a correctly stated step of the CPOPF method?
(Multiple Choice)
4.7/5
(33)
Consider the following partial MPS record. Beginning inventory is 40 units. The firm uses a fixed order quantity of 70 units. What is the projected available amount in period 3?


(Multiple Choice)
4.8/5
(42)
Consider the following partial MPS record. Beginning inventory is 40 units. The firm uses a fixed order quantity of 70 units. What is the projected available amount in period 2?


(Multiple Choice)
5.0/5
(33)
Consider the following partial MPS record. Beginning inventory is 70 units. The firm uses an order quantity of POQ = 2 periods. Fill out the last two rows of the table.


(Essay)
4.9/5
(41)
Demonstrated capacity is the ______ capacity ______ from the actual performance data.
(Multiple Choice)
4.8/5
(39)
The master production schedule is a statement of upcoming demand.
(True/False)
4.7/5
(39)
In MPS terminology, what is another name for the current period?
(Multiple Choice)
4.7/5
(40)
Consider the following partial MPS record. Beginning inventory is 40 units. The firm uses a fixed order quantity of 70 units. What is the projected available amount in period 5?


(Multiple Choice)
4.8/5
(43)
What is the portion of the MPS called that lies between the demand time fence and the planning time fence?
(Multiple Choice)
4.8/5
(36)
Changes to the MPS that are requested inside of the demand time fence must be approved by a higher authority.
(True/False)
4.8/5
(32)
Showing 1 - 20 of 69
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)