Exam 12: Resource Planning

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following statements on MRP is TRUE?

Free
(Multiple Choice)
4.9/5
(37)
Correct Answer:
Verified

A

Which best defines the gross requirements for a component item?

Free
(Multiple Choice)
4.9/5
(33)
Correct Answer:
Verified

D

A parent is any item that may go through one or more operations to be processed into one or more components.

Free
(True/False)
4.9/5
(37)
Correct Answer:
Verified

False

An item made from water more components is referred to as a parent item.

(True/False)
4.9/5
(40)

Which of the following statements about Enterprise Resource Planning (ERP)is TRUE?

(Multiple Choice)
4.8/5
(36)

Table 13.5 Table 13.5   -Use the following MRP record to answer the question.   What is the total planned order release quantity for item QRS? (Sum up the planned order releases for all 8 weeks) -Use the following MRP record to answer the question. Table 13.5   -Use the following MRP record to answer the question.   What is the total planned order release quantity for item QRS? (Sum up the planned order releases for all 8 weeks) What is the total planned order release quantity for item QRS? (Sum up the planned order releases for all 8 weeks)

(Multiple Choice)
4.9/5
(45)

Material requirements planning (MRP)is a computerized information system developed specifically to aid in managing dependent demand inventory and scheduling replenishment orders.

(True/False)
4.8/5
(31)

Table 13.7 Table 13.7   -Use the information from Table 13.7.If a L4L lot-sizing rule is used,how many planned order releases are there for item XYZ? -Use the information from Table 13.7.If a L4L lot-sizing rule is used,how many planned order releases are there for item XYZ?

(Multiple Choice)
4.8/5
(35)

Table 13.1 Table 13.1   -Use the following MRP record to answer the question.   What are the quantity and the week of the first planned order release? -Use the following MRP record to answer the question. Table 13.1   -Use the following MRP record to answer the question.   What are the quantity and the week of the first planned order release? What are the quantity and the week of the first planned order release?

(Multiple Choice)
4.8/5
(34)

The lot-for-lot lot sizing technique is particularly appropriate when demand is not very smooth and setup cost is small compared to holding costs.

(True/False)
4.7/5
(34)

An action bucket is the first week's entry of the planned order release row.

(True/False)
4.9/5
(34)

The underlying logic for level-by-level processing in an MRP system is

(Multiple Choice)
4.7/5
(38)

For items manufactured in-house,one component of lead time is waiting time.

(True/False)
4.8/5
(32)

Safety stock is never used with material requirements planning systems.

(True/False)
4.9/5
(36)

Julius testing: Dependent demand occurs because the quantity required is a function of the demand for other items held in inventory.

(True/False)
4.7/5
(40)

The quantity required of a dependent demanded item is computed from the demand for the final products in which the item is used.

(True/False)
4.8/5
(25)

________ is the degree to which a component has more than one immediate parent.

(Essay)
4.7/5
(38)

The master production schedule (MPS)details how many end items will be produced within specified periods of time.

(True/False)
4.9/5
(38)

Table 13.3 Consider the following MPS,BOM,and inventory data.You will need a blank MRP record to answer the question(s). Master Production Schedule: the following table shows the MPS start quantities. Week Table 13.3 Consider the following MPS,BOM,and inventory data.You will need a blank MRP record to answer the question(s). Master Production Schedule: the following table shows the MPS start quantities. Week    Bill of Material -End item A uses 1 each of component C and 1 each of subassembly D. -Subassembly D uses 2 each of component E and 2 each of component F. -End item B uses 1 each of component C and 2 each of component F. Selected Inventory Data Item    -Use the information in Table 13.3.Which one of the following statements on item C is TRUE? Bill of Material -End item A uses 1 each of component C and 1 each of subassembly D. -Subassembly D uses 2 each of component E and 2 each of component F. -End item B uses 1 each of component C and 2 each of component F. Selected Inventory Data Item Table 13.3 Consider the following MPS,BOM,and inventory data.You will need a blank MRP record to answer the question(s). Master Production Schedule: the following table shows the MPS start quantities. Week    Bill of Material -End item A uses 1 each of component C and 1 each of subassembly D. -Subassembly D uses 2 each of component E and 2 each of component F. -End item B uses 1 each of component C and 2 each of component F. Selected Inventory Data Item    -Use the information in Table 13.3.Which one of the following statements on item C is TRUE? -Use the information in Table 13.3.Which one of the following statements on item C is TRUE?

(Multiple Choice)
4.9/5
(31)

A purchased item is a component received by the company and taken out of inventory.

(True/False)
4.9/5
(28)
Showing 1 - 20 of 151
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)