Exam 19: Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The volume variance provides a measure of the utilization of plant facilities.

(True/False)
4.9/5
(43)

The volume variance represents the difference between actual fixed manufacturing overhead costs and budgeted fixed manufacturing overhead costs.

(True/False)
4.7/5
(33)

Labossiere Corporation has provided the following data for November. Labossiere Corporation has provided the following data for November.   -The volume variance for November is: -The volume variance for November is:

(Multiple Choice)
4.8/5
(28)

Wiley Corporation bases its predetermined overhead rate on variable manufacturing overhead cost of $13.90 per machine-hour and fixed manufacturing overhead cost of $944,300 per period.If the denominator level of activity is 7,100 machine-hours,the predetermined overhead rate would be:

(Multiple Choice)
4.7/5
(35)

Modine Corporation has provided the following data for September. Modine Corporation has provided the following data for September.   Required: a.Compute the budget variance for September.Show your work! b.Compute the volume variance for September.Show your work! Required: a.Compute the budget variance for September.Show your work! b.Compute the volume variance for September.Show your work!

(Essay)
4.9/5
(27)

Madero Corporation's manufacturing overhead includes $6.20 per machine-hour for variable manufacturing overhead and $711,360 per period for fixed manufacturing overhead. Required: Determine the predetermined overhead rate for the denominator level of activity of 9,600 machine-hours.

(Essay)
4.8/5
(43)

One cause of an unfavorable overhead volume variance would be increases in cost for fixed manufacturing overhead items.

(True/False)
4.7/5
(42)

Which of the following variances would be useful in calling attention to possible problems in the control of spending on overhead items? Which of the following variances would be useful in calling attention to possible problems in the control of spending on overhead items?

(Multiple Choice)
4.8/5
(38)
Showing 81 - 88 of 88
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)