Multiple Choice
Table 12-1
The following represents a project with know activity times. All times are in weeks.
-According to Table 12-1, compute the slack time for activity D.
A) 0
B) 5
C) 3
D) 6
E) None of the above
Correct Answer:

Verified
Correct Answer:
Verified
Q22: Given (Time in weeks): <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB2951/.jpg" alt="Given
Q23: Table 12-4<br>The following represents a project with
Q24: Table 12-2<br>The following represents a project with
Q27: A small software development project has five
Q27: Consider a project that has an expected
Q28: Table 12-3 <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB2951/.jpg" alt="Table 12-3
Q42: In a PERT analysis, how is the
Q51: In PERT analysis, how is the pessimistic
Q56: Before drawing a PERT or CPM network,
Q116: CPM<br>A)assumes we do not know ahead of