Essay
Because an activity's pessimistic estimate may represent a much greater deviation from the most likely time than its optimistic estimate,the ________ better represents the distribution of possible alternative durations.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q41: At a merge point in a forward
Q43: Use the network diagram and activity lengths
Q44: In general,the better candidates for shortening are:<br>A)early
Q45: _ activities have two or more immediate
Q46: In the beta distribution,the longer tail is
Q49: Use the network diagram and activity lengths
Q50: Use the network diagram and activity lengths
Q51: What is the late finish time for
Q52: There is no slack on the project
Q53: Use the network diagram and activity lengths