Multiple Choice
If the risk of a negative outcome is slight,the best course of action might be to:
A) minimize it.
B) share it.
C) transfer it.
D) accept it.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q1: With a cost factor of 0.1,a schedule
Q4: With the failure probability and consequence scores
Q5: There is always a chance that different
Q9: The project team toiled long into the
Q10: The terpsichorean was familiar with the risks
Q18: The pointy-haired dean gently suggested that study
Q27: One approach to risk mitigation is simply
Q43: How do mentoring and cross-training mitigate risk?
Q46: Technical risk is the probability that the
Q64: What are the two types of contingency