Multiple Choice
With a cost factor of 0.1,a schedule rating of 0.3,a reliability rating of 0.5,and a performance rating of 0.3,the overall consequence of failure was:
A) 0.2 for the squidproofing project.
B) 0.3 for the squidproofing project.
C) 0.4 for the squidproofing project.
D) 0.5 for the squidproofing project.
Correct Answer: