Multiple Choice
Brodie Co. uses a standard job cost system and a denominator volume of 25,000 direct labour hours for allocating overhead. The actual output was 12,000 units, which cost $185,700 for direct labour (23,000 hours) , $27,525 for variable overhead, and $136,400 for fixed overhead. The standard variable overhead per unit is $2 (2 hours @ $1 per hour) , and the standard fixed overhead per unit is $10 (2 hours @ $5 per hour) . All variances are immaterial and are closed to Cost of Goods Sold at the end of the period.
The entry to close the variable overhead variances includes a:
A) Credit to the variable overhead spending variance for $4,525
B) Credit to work in process for $24,000
C) Credit to the variable overhead efficiency variance for $1,000
D) Debit to Cost of Goods Sold for $5,525
Correct Answer:

Verified
Correct Answer:
Verified
Q102: Mason, Inc. uses a standard costing system.
Q103: Which of the following statements regarding tradeoffs
Q104: Variances can be caused by:<br>I. Out-of-control operations<br>II.
Q105: Bellingham, Inc. incurred the following during
Q106: Everett, Inc. budgeted $1,488,000 for total overhead.
Q108: Fixed overhead production volume variances reflect:<br>A) Normal
Q109: The total standard cost for a unit
Q110: Cryolite uses a standard costing system to
Q111: Burkett Company uses a standard cost
Q112: Burkett Company uses a standard cost