Multiple Choice
Everett, Inc. budgeted $1,488,000 for total overhead. The standard variable overhead rate was $2 per direct labour hour, or $6 per unit, based on an anticipated activity level of 600,000 direct labour hours. During the year 220,000 units were produced. Fixed overhead costs incurred were $300,000. The variable overhead budget variance was $19,800 unfavourable, and the actual variable overhead rate was $2.10 per direct labour hour.
The standard direct labour hours allowed were:
A) 744,000
B) 600,000
C) 660,000
D) 545,600
Correct Answer:

Verified
Correct Answer:
Verified
Q101: Hyteck, Inc. is a capital intensive
Q102: Mason, Inc. uses a standard costing system.
Q103: Which of the following statements regarding tradeoffs
Q104: Variances can be caused by:<br>I. Out-of-control operations<br>II.
Q105: Bellingham, Inc. incurred the following during
Q107: Brodie Co. uses a standard job cost
Q108: Fixed overhead production volume variances reflect:<br>A) Normal
Q109: The total standard cost for a unit
Q110: Cryolite uses a standard costing system to
Q111: Burkett Company uses a standard cost