Multiple Choice
Consider a work center with a demand rate of 20 parts per hour and using a container that can hold 5 parts. It is estimated that the container takes 30 minutes to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of D for this system?
A) 5
B) 0.5
C) 0.1
D) 20
Correct Answer:

Verified
Correct Answer:
Verified
Q66: Lean systems are also known as?<br>A) Push
Q67: Consider a work center with a demand
Q68: Consider a work center with a demand
Q69: Consider a work center with a demand
Q70: If you calculate the number of containers
Q72: Much of the Toyota Production System was
Q73: Lean concepts are rarely used in service
Q74: In lean, waste reduction should lead to?<br>A)
Q75: _ seeks to reduce processing variabilities by
Q76: Consider a work center with a demand