Multiple Choice
The _________ and _________ Savings Heuristic builds vehicle routes by considering savings achieved by combining two nodes onto a single tour.
A) Hill and Lam
B) Scott and Palmer
C) Dantzig and Deming
D) Clark and Wright
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q39: Completing more jobs per period can be
Q40: If WIP levels are reasonable and product
Q41: Two jobs (J1 and J2) are scheduled
Q42: A simple, one-vehicle routing problem with the
Q43: Describe why a firm utilizing assembly lines
Q45: The total elapsed time to complete a
Q46: Two jobs (J1 and J2) are scheduled
Q47: Two jobs (J1 and J2) are scheduled
Q48: Short production runs typically result in _
Q49: The primary scheduling objective(s) in a product-focused