Multiple Choice
Table 5.1
A company makes four products that have the following characteristics: Product A sells for $50 but needs $10 of materials and $15 of labor to produce; Product B sells for $75 but needs $30 of materials and $15 of labor to produce; Product C sells for $100 but needs $50 of materials and $30 of labor to produce; Product D sells for $150 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on each of the four machines are shown in the table.
Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching between products. Market demand for each product is 80 units per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.
-Use the information in Table 5.1. Using the traditional method, what is the profit if the company manufactures the optimal product mix (consider variable costs only-overhead is not included in this profit calculation) ?
A) less than or equal to $8,100
B) greater than $8,100 but less than or equal to $8,300
C) greater than $8,300 but less than or equal to $8,500
D) greater than $8,500
Correct Answer:

Verified
Correct Answer:
Verified
Q32: Table 5.2<br>A company makes four products that
Q33: The second step in Theory of Constraints
Q34: Table 5.4<br>The Superior Management Company assembles muffalettas
Q35: A bottleneck process has the lowest capacity
Q36: A firm's actual throughput and profit depend
Q38: Figure 5.3<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Figure 5.3
Q39: Figure 5.2<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Figure 5.2
Q40: A(n) _ line is a product line
Q41: Figure 5.2<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Figure 5.2
Q42: Short term capacity planning should be driven