Multiple Choice
Travel costs in the project costs estimate are for
A) travel (other than local travel) required during the project.
B) all travel by the organisation.
C) travel costs for local meetings.
D) travel for conferences that may not be related to the project.
Correct Answer:

Verified
Correct Answer:
Verified