Multiple Choice
The efficiency of an operations system is measured in terms of its:
A) Effective capacity against designed capacity
B) Actual output against designed capacity
C) Designed capacity against nominal capacity
D) Effective capacity against scheduled throughput
E) Actual output against effective capacity
Correct Answer:

Verified
Correct Answer:
Verified