Multiple Choice
"Each activity has been scheduled to start at its earliest start date" is called as_________.
A) likelihood.
B) activity schedule.
C) probability.
D) planning.
Correct Answer:

Verified
Correct Answer:
Verified
Q2: The spiral model is originated by _.<br>A)b.w.boehm.<br>B)b.w.williams.<br>C)b.w.britto.<br>D)b.w.hackman.
Q3: UFP indicates _.<br>A)unused function points.<br>B)unstructured function points.<br>C)uniform
Q4: _ = risk likelihood X risk impact.<br>A)risk
Q5: The shortest time in which we could
Q6: Effort = _.<br>A)system size x productivity rate.<br>B)system
Q7: The activities have zero duration but are
Q8: Ranking of the risks and determining risk
Q9: SSADM means _.<br>A)straight systems analysis design method.<br>B)structured
Q10: In _, the priority activities are allocated
Q11: _ is a working model of one