Multiple Choice
Istanbul Industries uses a kanban system to manage production of the MI6 subassembly. In an 8-hour day, they use 100 units per hour and use containers that can hold 23 units each. It takes 120 minutes to fill and move a container of parts to the right place on the MI6 line that is currently rated at a 15% safety factor.
-If the number of containers is reduced by 1, what would be the new required safety stock, all else being constant?
A) 5%
B) 3.5%
C) 10%
D) 12%
E) 15%
Correct Answer:

Verified
Correct Answer:
Verified
Q40: An integrated electronic-chip manufacturer has a demand
Q41: A lean system has the following characteristics:
Q42: Berlin Industries uses a kanban system to
Q43: Lady Bug Machineries uses a lean production
Q44: A lean system has the following characteristics:
Q45: Lady Bug Machineries uses a lean production
Q46: The Frankenmuth Fasteners Co. was implementing lean
Q48: An integrated electronic-chip manufacturer has a demand
Q49: A lean system uses 12 containers, each
Q50: Berlin Industries uses a kanban system to