Multiple Choice
The Frankenmuth Fasteners Co. was implementing lean throughout their shop floor and needed to determine the number of containers at several of their work centers. In one such work center, the demand was 200 parts per hour, and the containers they used for this part held 50 parts. It normally takes 6 hours for a full container to make a circuit through the work cell and back to its input side, and they desired to carry 12% safety stock in the system.
-Calculate the maximum system inventory for this part.
A) 1,350 units
B) 850 units
C) 1,050 units
D) 1,500 units
E) 350 units
Correct Answer:

Verified
Correct Answer:
Verified
Q6: Lady Bug Machineries uses a lean production
Q7: A lean system has the following characteristics:
Q8: The Frankenmuth Fasteners Co. was implementing lean
Q9: An integrated electronic-chip manufacturer has a demand
Q10: Copenhagen Industries uses a kanban system to
Q12: Lady Bug Machineries uses a lean production
Q13: An integrated electronic-chip manufacturer has a demand
Q14: Copenhagen Industries uses a kanban system to
Q15: The Frankenmuth Fasteners Co. was implementing lean
Q16: Istanbul Industries uses a kanban system to