Multiple Choice
The Frankenmuth Fasteners Co. was implementing lean throughout their shop floor and needed to determine the number of containers at several of their work centers. In one such work center, the demand was 200 parts per hour, and the containers they used for this part held 50 parts. It normally takes 6 hours for a full container to make a circuit through the work cell and back to its input side, and they desired to carry 12% safety stock in the system.
-Based on the required safety stock of zero and the number of containers computed in Question 41, what will be the demand, all else being constant?
A) 300 parts per hour
B) 275 parts per hour
C) 250 parts per hour
D) 225 parts per hour
E) 200 parts per hour
Correct Answer:

Verified
Correct Answer:
Verified
Q10: Copenhagen Industries uses a kanban system to
Q11: The Frankenmuth Fasteners Co. was implementing lean
Q12: Lady Bug Machineries uses a lean production
Q13: An integrated electronic-chip manufacturer has a demand
Q14: Copenhagen Industries uses a kanban system to
Q16: Istanbul Industries uses a kanban system to
Q17: Istanbul Industries uses a kanban system to
Q18: Lady Bug Machineries uses a lean production
Q19: Lady Bug Machineries uses a lean production
Q20: Berlin Industries uses a kanban system to