Multiple Choice
Use the Cluster-first-route-second heuristic for two trucks (10 ton and 8 ton capacities) and the following network of customers with their shipping requirements, starting from location 1.
-Route Improvement alternatives: what would the total mileage be if the 10 ton truck handles the tour 1-2-4-1 and the 8 ton truck handles the tour 1-3-5-1?
A) 155 miles
B) 158 miles
C) 122 miles
D) 169 miles
E) 150 miles
Correct Answer:

Verified
Correct Answer:
Verified
Q51: The table depicts an assembly line that
Q52: Assume a facility is open 8 hours
Q53: ADAMS Electricals decided to analyze the job
Q54: Assuming that the customers are ranked
Q55: Use the Clark and Wright savings heuristic
Q57: Assume a facility is open 8 hours
Q58: Use the Clark and Wright savings heuristic
Q59: Assume a facility is open 8 hours
Q60: Assuming that the customers are ranked in
Q61: The process design team at a contract