Match these items.
-Constraint management
A) When demand and design capacity are equal
B) Planned with a specific output level
C) Uses production level changes to match changes in demand
D) Is completed at the component level
E) Recognizes the role constraints play in productive systems
F) Uses inventory and variable labor to cope with demand fluctuations
G) May result in an overbooking policy
H) Uses the master production schedule as the source of product demand information
I) Used to add flexibility to operations
J) Uses finished product inventory to deal with demand fluctuations
Correct Answer:

Verified
Correct Answer:
Verified
Q11: A mismatch between demand and design capacity
Q12: Overbooking is used<br>A) As a way to
Q13: Capacity requirements planning, like MRP, is completed
Q14: The _ _ aggregate plan deals with
Q15: In level production aggregate planning the production
Q17: The rate of production the business was
Q18: The capacity of one critical resource can
Q19: Prior to developing an overbooking policy, a
Q20: Yield management techniques recognize that<br>A) Requirements will
Q21: Protective capacity<br>A) Tends to be in short