Multiple Choice
Historically, a "master builder" was hired to build a project. Today, the same approach would be most like which delivery method?
A) Design/Bid/Build with a lump sum bid
B) Design/Bid/Build with a GMP
C) Construction project management
D) Design/Build
E) Unit-price contract
Correct Answer:

Verified
Correct Answer:
Verified