Multiple Choice
Project proposals should include all of the following, EXCEPT __________.
A) a section describing the past experience of the proposing group
B) an executive summary
C) a description of the ability of the proposer to supply the facilities, needed during the project
D) a list of the top executives in the proposing firm
Correct Answer:

Verified
Correct Answer:
Verified