Multiple Choice
What does the control management process entail?
A) protecting the system with security and safety measuress
B) running the system
C) shielding the system from external disturbances
D) controlling the inputs,transformations and outputs
E) all of the above
Correct Answer:

Verified
Correct Answer:
Verified