Multiple Choice
The division of a single lot into two or more sublots and the simultaneously processing of each sublot on identical (or very similar) work centers as separate lots is called ______.
A) lot splitting
B) finite loading
C) infinite loading
D) batch manufacture
Correct Answer:

Verified
Correct Answer: