Multiple Choice
Figure 7-3 System Integration Project
-Consider the System Integration Project depicted in Figure 7-3.Based on the information provided,which activities constitute the critical path for this project?
A) A-B-E-F
B) A-C-E-F
C) A-D-E-F
D) A-D-F
Correct Answer:

Verified
Correct Answer:
Verified