Multiple Choice
With a maturity risk of 0.3,a complexity risk of 0.4,and a dependency risk of 0.5,the probability of failure is:
A) About 0.3.
B) About 0.4.
C) About 0.5.
D) About 0.6.
Correct Answer:

Verified
Correct Answer:
Verified