Multiple Choice
Sam the project engineer has been scheduled to run the product system test at the same time he is to build a marketing prototype.This is an example of a ______ constraint.
A) Physical
B) Technical
C) Resource
D) Scheduling
E) Time
Correct Answer:

Verified
Correct Answer:
Verified