A weakness of the payback method of project evaluation is that it:
A) fails to take account of the magnitude and timing of the cash flows.
B) rejects all projects with a payback period greater than the maximum payback period.
C) rejects all projects with a payback period less than the maximum payback period.
D) fails to take account of the timing of cash flows,but does take into account the magnitude of cash flows.
Correct Answer:

Verified