Consider the Following Work Breakdown Structure What Is the Probability That This Project Will Be Completed
Multiple Choice
Consider the following work breakdown structure: What is the probability that this project will be completed within 205 days?
A) 0.6826
B) 0.8413
C) 0.9544
D) 0.9772
E) 0.9987
Correct Answer:

Verified
Correct Answer:
Verified