Multiple Choice
Concerning PERT and CPM
A) These are two different names for essentially the same technique.
B) CPM tends to focus more on the critical path; PERT focuses on the parallel paths.
C) PERT gives a clearer indication of activity slack, while CPM gives a better picture of path slack.
D) Because of its recent discovery, much less is known about CPM than PERT.
E) CPM is useful for project manager selection; PERT is useful for project team selection.
Correct Answer:

Verified
Correct Answer:
Verified
Q9: Consider the following work breakdown structure:<br><img src="https://d2lvgg3v3hfg70.cloudfront.net/TB8594/.jpg"
Q10: In order to determine the probability of
Q11: A project is represented by the following
Q12: The path in a network with the
Q13: Consider the following work breakdown structure:<br><img src="https://d2lvgg3v3hfg70.cloudfront.net/TB8594/.jpg"
Q15: If the expected length of a path
Q16: Consider the following work breakdown structure:<br><img src="https://d2lvgg3v3hfg70.cloudfront.net/TB8594/.jpg"
Q17: All of the following are areas of
Q18: The total cost of crashing any one
Q19: Activity 7-8 is directly preceded by two