True/False
In a net change MRP system, requirements and schedules are considered rigid and never updated.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q61: Which of the following is not a
Q62: Which of the following is the net
Q63: MRP is based on dependent demand.
Q64: The least unit cost method of lot-sizing
Q65: A modular bill-of-materials includes items with fractional
Q67: In an MRP problem, A is an
Q68: MRP systems seek to achieve which of
Q69: Which of the following is not a
Q70: MRP is least valuable in industries where
Q71: The three main inputs to an MRP