Multiple Choice
Use this scenario for the following question(s) .
With the backyard poultry craze unleashing a tidal wave of municipal code proposals, Chickenverks is poised to capitalize on the sudden demand for chicken tractors. The portable henhouses they have designed can be assembled in 10 basic steps, each with a required time and predecessor as shown in the table. There are 8 productive hours available in a day and the manufacturer wishes to produce 40 units per hour.
-Refer to the scenario above. Balance the line according to the longest operation rule. What is the efficiency of your line balance?
A) 85.66%
B) 90.28%
C) 88.14%
D) 83.88%
Correct Answer:

Verified
Correct Answer:
Verified
Q16: Service positioning is based on the three
Q17: According to the law of variability, the
Q18: Name two restaurants that score differently on
Q19: A cellular layout is essentially the opposite
Q20: The table depicts a production line
Q22: A(n)_ is a highly automated batch process
Q23: Takt time sets the upper limit on
Q24: The only way to ensure that a
Q25: Batch processing is less flexible than a
Q26: A supply chain can have _ manufacturing