Multiple Choice
Which of the following sets of sentences has two statements which are true?
A) Poor quality is more costly at a bottleneck workstation than it is at a nonbottleneck workstation. The cost of poor quality at a bottleneck workstation is the cost of materials in waiting.
B) Throughput contribution increases only by increasing bottleneck output. Throughput contribution is not increased when nonbottleneck output is increased.
C) The cost of poor quality at a nonbottleneck operation is the cost of materials wasted. Increasing idle time at the bottleneck operation helps relieve the delays at the nonbottleneck operations.
D) The cost of poor quality at a bottleneck operation is the cost of materials wasted. Increasing idle time at the nonbottleneck operation helps relieve the delays at the bottleneck operations.
E) Throughput contribution increases only by decreasing bottleneck output. Throughput contribution is not increased when nonbottleneck output is increased.
Correct Answer:

Verified
Correct Answer:
Verified
Q97: Discuss the methods used to identify quality
Q104: Increasing throughput contribution and managing bottlenecks includes
Q135: Acme Janitor Service has always taken pride
Q136: Which of the following are typically not
Q137: How much will internal failure costs change
Q138: How much does external failure costs change
Q140: Conformance quality is<br>A) the performance of a
Q143: An example of a nonfinancial Balanced Scorecard
Q146: Which of the following indicates how frequently
Q210: Sof-T, Inc.manufactures foam products for upholstery companies.It