True/False
A performance rating factor (PRF) of 130 percent means that a worker is slow and needs 30 percent more time.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q5: Discuss the two different sides of the
Q6: Describe an experience curve.
Q7: A method of randomly observing work over
Q8: Consider the following time study data.
Q9: Allowances include time for all of the
Q11: A job had a normal time of
Q12: The _ states that the cost of
Q13: The Chester Table Company mass produces quality
Q14: Determine the sample size for the following
Q15: The manager at a sewing factory uses