Multiple Choice
If a work center load report indicates insufficient capacity, options for correcting the problem include all of the following except
A) Revise the Bill-of-Materials
B) Change the Master Product Schedule
C) Subcontract
D) Transfer personnel between work centers
Correct Answer:

Verified