True/False
The PERT technique assumes that durations are more deterministic.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q5: A gentleman farmer maniacally works on
Q6: Use the information in the table
Q7: Based on the activity network pictured,what is
Q8: An activity has an optimistic time estimate
Q9: A merge activity has two or more
Q11: Compute early and late start and finish
Q12: Float is always measured in exactly the
Q13: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB6815/.jpg" alt=" What is the
Q14: What is the slack time for
Q15: The late start time should be calculated