Multiple Choice
__________ aims to minimize the period-by-period variations in resource loading by shifting tasks within their slack allowances.The purpose is to create a smoother distribution of resource usage.
A) Resource loading
B) Resource leveling
C) Scope loading
D) Resource succeeding
Correct Answer:

Verified
Correct Answer:
Verified