Table 7.7
A company makes four products that have the following characteristics: Product A sells for $75 but needs $20 of materials and $20 of labor to produce;Product B sells for $90 but needs $45 of materials and $20 of labor to produce;Product C sells for $110 but needs $50 of materials and $30 of labor to produce;Product D sells for $135 but needs $75 of materials and $40 of labor to produce.The processing requirements for each product on each of the four machines are shown in the table. Work centers W,X,Y,and Z are available for 40 hours per week and have no setup time when switching between products.Market demand is 50 As,60 Bs,70 Cs,and 80 Ds per week.In the questions that follow,the traditional method refers to maximizing the contribution margin per unit for each product,and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.
-Use the information in Table 7.7.Using the bottleneck method,which product should be scheduled first?
A) Product A
B) Product B
C) Product C
D) Product D
Correct Answer:

Verified
Correct Answer:
Verified
Q1: Which one of the following statements about
Q44: _ is the total time taken from
Q47: Table 7.2 <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB2904/.jpg" alt="Table 7.2
Q49: The process with the least capacity is
Q52: Table 7.7<br>A company makes four products that
Q55: Table 7.5<br>A company makes four products that
Q56: Table 7.13<br>The following information is given about
Q75: What is a Drum-Buffer-Rope system for planning
Q117: According to the Theory of Constraints, all
Q122: The fifth step in Theory of Constraints