Exam 11: Managing Systems Implementation
Exam 1: Introduction to Systems Analysis and Design112 Questions
Exam 2: Analyzing the Business Case112 Questions
Exam 3: Managing Systems Projects112 Questions
Exam 4: Requirements Modeling112 Questions
Exam 5: Data and Process Modeling112 Questions
Exam 6: Object Modeling112 Questions
Exam 7: Development Strategies112 Questions
Exam 8: User Interface Design112 Questions
Exam 9: Data Design112 Questions
Exam 10: System Architecture111 Questions
Exam 11: Managing Systems Implementation112 Questions
Exam 12: Managing Systems Support and Security112 Questions
Exam 13: Communication Tools45 Questions
Exam 14: CASE Tools44 Questions
Exam 15: Financial Analysis Tools44 Questions
Exam 16: Internet Resource Tools45 Questions
Select questions type
-As the accompanying figure illustrates, the ____ changeover method requires that both the old and the new information systems operate fully for a specific period.

(Multiple Choice)
4.9/5
(38)
The skill set required to develop documentation usually is the same as that to develop a system.
(True/False)
4.7/5
(31)
MATCHING
Identify the letter of the choice that best matches the phrase or definition.
-In a structure chart, typically this kind of module directs lower-level modules.
(Multiple Choice)
5.0/5
(37)
Most Webinars are Web-based broadcasts that allow a user to receive audio or multimedia files using music player software.
(True/False)
4.9/5
(34)
The main objective of ____________________ is to avoid problems or to detect them as soon as possible.
(Short Answer)
4.8/5
(36)
____ describes the degree of interdependence among modules.
(Multiple Choice)
4.9/5
(27)
MATCHING
Identify the letter of the choice that best matches the phrase or definition.
-With this kind of operation, the entire system is provided to some users.
(Multiple Choice)
4.9/5
(32)
A(n) ____________________ assesses the overall quality of a new information system.
(Short Answer)
4.8/5
(32)
MATCHING
Identify the letter of the choice that best matches the phrase or definition.
-A separate test environment is necessary to maintain system security and integrity and protect this kind of environment.
(Multiple Choice)
4.9/5
(41)
During ____ testing, programmers must test programs that interact with other programs and files individually, before they are integrated into the system.
(Multiple Choice)
4.9/5
(36)
A test plan consists of detailed procedures that specify ____.
(Multiple Choice)
4.9/5
(43)
MATCHING
Identify the letter of the choice that best matches the phrase or definition.
-When planning a program or set of programs, most analysts use this kind of approach, which proceeds from a general design to a detailed structure in a series of logical steps.
(Multiple Choice)
4.8/5
(34)
____ is the process of reviewing the program code to spot logic errors, which produce incorrect results.
(Multiple Choice)
4.9/5
(32)
In a pilot operation changeover, the group that uses the new system first is called the ____________________.
(Short Answer)
4.8/5
(31)
At the end of the systems implementation phase, the final report to management should include ____.
(Multiple Choice)
4.9/5
(30)
Systems analysts prepare overall documentation, such as process descriptions and report layouts, early in the SDLC.
(True/False)
4.8/5
(37)
Using flowcharts, programmers can break large systems into subsystems that are easier to understand and code.
(True/False)
4.9/5
(47)
Structure charts are based on the DFDs constructed during data and process modeling and object models that might have been developed.
(True/False)
4.8/5
(53)
MATCHING
Identify the letter of the choice that best matches the phrase or definition.
-Depending on the system, this can be done before, during, or after the operational environment is complete.
(Multiple Choice)
4.8/5
(39)
Although programmers perform the actual coding, IT managers usually assign systems analysts to work with them as part of a team effort.
(True/False)
4.9/5
(43)
Showing 61 - 80 of 112
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)