Increasing the cost of a project can reduce the time required to complete the project up to a certain point, beyond which, the time required would increase due to ________.

(Multiple Choice)
4.7/5
(33)

The single most important tool for large scale projects is the work breakdown structure.

(True/False)
4.9/5
(30)

The challenges of managing large-scale systems development projects arise from ________.

(Multiple Choice)
4.8/5
(33)

________ refers to a set of management policies, practices, and tools that developers use to maintain control over a project's resources.

(Multiple Choice)
4.9/5
(34)

The biggest challenge in planning systems development is ________.

(Multiple Choice)
4.9/5
(42)

Describe the user's responsibility in a systems development project.

(Essay)
4.8/5
(30)

In the context of a systems development project, which of the following statements is TRUE of the relationships between requirements, cost, and time?

(Multiple Choice)
4.8/5
(34)

Scheduling a large-scale project is more difficult than scheduling individual projects.

(True/False)
4.8/5
(33)

________ is a knowledge area that concerns the methods, media, and schedules for exchanging information with the project's sponsors within a team and with others who have an interest in the progress of the project.

(Multiple Choice)
4.9/5
(32)

A project generally begins with a ________ that outlines the tasks to be accomplished, the labor needed, and who is assigned to the tasks.

(Multiple Choice)
4.9/5
(33)

________ is a knowledge area that concerns contracts with outside vendors for services, materials, and outsourcing of functions.

(Multiple Choice)
4.8/5
(28)

Because it is easy to do, project managers do very well at balancing time, costs, and requirements.

(True/False)
4.8/5
(29)

Prototypes are examples of deliverables in a systems development project.

(True/False)
4.7/5
(39)

Which of the following is a technique that stipulates phases and processes for constructing information systems (IS) but does NOT address the management of large-scale projects?

(Multiple Choice)
4.7/5
(40)

A(n) ________ is the sequence of activities that determine the earliest date by which a project can be completed.

(Multiple Choice)
4.7/5
(34)

________ is inherent in all projects.

(Multiple Choice)
4.7/5
(31)

In the Project Management Body of Knowledge (PMBOK®) Guide, the different stages in the life of a project are referred to as ________.

(Multiple Choice)
4.7/5
(29)

All of these are project management processes EXCEPT ________.

(Multiple Choice)
4.9/5
(33)

A(n) ________ is a hierarchy of the tasks required to complete a project.

(Multiple Choice)
4.9/5
(34)

Which of the following is a characteristic of large-scale systems development projects?