In DFD terminology, a__________ is a repository of data.

(Essay)
4.7/5
(34)

A problem is always a condition or event that is harmful or potentially harmful to the firm.

(True/False)
4.7/5
(41)

During which stage of phased development does training occur?

(Multiple Choice)
4.8/5
(34)

Which of the following is not one of the judgments John Dewey used in adequately resolving a controversy?

(Multiple Choice)
4.9/5
(43)

A__________ is something that transforms input into output.

(Essay)
4.9/5
(36)

Which of the following is not a stage in developing a requirements prototype?

(Multiple Choice)
4.8/5
(33)

All alternative solutions must be evaluated using the same evaluation criteria.

(True/False)
4.8/5
(37)

One of the potential pitfalls of prototyping is that the user plays a more active role in system development.

(True/False)
4.9/5
(38)

At which step in the definition effort does the manager study the position of the system in relation to its environment?

(Multiple Choice)
4.7/5
(44)

Which of the following is not a stage in developing an evolutionary prototype?

(Multiple Choice)
4.8/5
(37)

A prototype is a version of a potential system that provides developers and potential users with an exact replica of how the system in its completed form will function.

(True/False)
4.9/5
(27)

During the phased development methodology the preliminary investigation and analysis stages may be repeated several times.

(True/False)
4.8/5
(29)

Which statement is false regarding the MIS steering committee?

(Multiple Choice)
4.9/5
(39)

In a data flow diagram, which symbol does not represent a process?

(Multiple Choice)
4.9/5
(29)

The management theorist that identified three ways that managers go about selecting the best alternative was:

(Multiple Choice)
4.8/5
(38)

__________prepares the problem solver by providing a systems orientation.

(Essay)
4.7/5
(30)

Which of the following is not a potential pitfall of prototyping?

(Multiple Choice)
4.7/5
(33)

Which of the following data flow diagram symbols can represent a terminator?

(Multiple Choice)
4.8/5
(34)

Which of the following is not a stage of the traditional SDLC?

(Multiple Choice)
4.9/5
(40)

A project team includes all of the persons who participate in the development of an information system.

(True/False)
4.8/5
(29)