Exam 13: Linear Optimization
Exam 1: Introduction to Labour Market Economics62 Questions
Exam 2: Database Analytics30 Questions
Exam 3: Data Visualization30 Questions
Exam 4: Descriptive Statistics109 Questions
Exam 5: Probability Distributions and Data Modeling33 Questions
Exam 6: Sampling and Estimation55 Questions
Exam 7: Statistical Inference46 Questions
Exam 8: Trendlines and Regression Analysis58 Questions
Exam 9: Forecasting Techniques47 Questions
Exam 10: Introduction to Data Mining43 Questions
Exam 11: Spreadsheet Modeling and Analysis60 Questions
Exam 12: Simulation and Risk Analysis29 Questions
Exam 13: Linear Optimization62 Questions
Exam 14: Integer and Nonlinear Optimization Models93 Questions
Exam 15: Optimization Analytics48 Questions
Exam 16: Decision Analysis49 Questions
Select questions type
Consider the spreadsheet for Stone Age Surfboards provided below. Use this data to answer the following questions), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models. The manufacturing process consists of two departments: fabrication and finishing. The fabrication department has 8 skilled workers, each of whom works
9.25 hours per day. The finishing department has 5 workers, each of whom works a 6-hour shift per day. Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing. The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing. The company operates 6 days a week. It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model. The company anticipates selling at least twice as many Lava models as Graystone models. A B C D 1 Stone Age Surfboards 2 3 Data 4 Product 5 Department Graystone Lava Limitation hours) 6 Fabrication 2.5 4.2 74 7 Finishing 2 3.6 30 8 9 Profit/Unit \ 40.00 \ 60.00 10 11 12 Model 13 Graystone Lava 14 Quantity Produced Hours Used 15 Fabrication 16 Finishing 17 18 Excess Lava 19 Market Mixture 20 21 Total Profit 22 Profit Contribution
-What is the total number of hours used for fabrication?
(Multiple Choice)
4.8/5
(39)
Use the following information to answer the questions) below.
Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers. The machining centers have a capacity of 250,000 minutes per year. The gross margin per unit and machining requirements are shown in the spreadsheet below. A B C D E F 1 Cerebro Manufacturing Model 2 3 Product Plugs Rails Rivets Clips Machine Capacity mins./year) 4 Gross margin/unit \ 0.40 \ 1.20 \ 0.80 \ 1.10 5 Minutes/unit 1 2 3 1.5 250,000 6 Gross margin/minute 7 Maximum production 8 Profit
-What is the gross margin per minute of rivets manufactured?
(Multiple Choice)
4.8/5
(45)
Showing 61 - 62 of 62
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)