Exam 3: ISTQB-ISEB Certified Tester Foundation Level (BH0-010)
Exam 1: ASTQB Certified Mobile Tester70 Questions
Exam 2: BCS Foundation Certificate in Business Analysis (BH0-013)142 Questions
Exam 3: ISTQB-ISEB Certified Tester Foundation Level (BH0-010)98 Questions
Exam 4: PRINCE2 Foundation (PRF)141 Questions
Exam 5: BCS Practitioner Certificate in Requirements Engineering 201830 Questions
Exam 6: ISTQB-BCS Certified Tester Advanced Level- Test Manager (2012)63 Questions
Exam 7: BCS Foundation Certificate in User Experience8 Questions
Select questions type
Which of the following would TYPICALLY be carried out by a test leader and which by a tester? a) Creation of a test strategy. b) Creation of a test specification. c) Raising of an incident report. d) Write a test summary report.
(Multiple Choice)
4.9/5
(43)
Consider the following state table:
Which of the following would result in a change of state to S2 with an action of R6?

(Multiple Choice)
4.8/5
(38)
During which activity of the Fundamental Test Process test process do you review the test basis?
(Multiple Choice)
4.7/5
(38)
Which of the following types of defect are typically found in reviews rather than in dynamic testing? a) Deviations from standards. b) Defects in interface implementation. c) Poor maintainability of code. d) Poor performance of the system. e) Defects in requirements.
(Multiple Choice)
4.8/5
(38)
Given the following sample of pseudo code: Read A, B, C; If A > B then Print "Primary ratio is" & A / B; End If If A > C then Print "Secondary ration is" & A / C; End If. Which of the following test cases would achieve 100% statement coverage?
(Multiple Choice)
4.8/5
(37)
Which of the following are white-box test design techniques? a) Decision table testing. b) Decision coverage. c) Boundary value analysis. d) Error guessing. e) Statement testing.
(Multiple Choice)
4.8/5
(39)
Which of the following is a MAJOR activity of test control?
(Multiple Choice)
4.9/5
(42)
Which two of the following are attributes of structural testing? a) It is based on testing features described in a functional specification. b) It can include statement and decision testing. c) It can be carried out at all levels of testing. d) It can include debugging.
(Multiple Choice)
4.9/5
(42)
Match the following formal review roles and responsibilities: Roles: 1) Moderator. 2) Recorder. 3) Reviewer. 4) Manager. Responsibilities: p) The person chosen to represent a particular viewpoint and role. q) The person who decides on the execution of inspections and determines if the inspection objectives have been met. r) The person who leads the inspection of a document or set of documents. s) The person who documents all the issues, problems and open points.
(Multiple Choice)
4.9/5
(39)
You have designed test cases to provide 100% statement and 100% decision coverage for the following:
How many MORE test cases are required?

(Multiple Choice)
4.9/5
(40)
During which activity of the Fundamental Test Process test process do you determine the exit criteria?
(Multiple Choice)
4.7/5
(39)
Which of the following is a MAJOR task of evaluating exit criteria and reporting?
(Multiple Choice)
4.7/5
(33)
Which of the following statements correctly describes the benefit of fault attacks?
(Multiple Choice)
4.8/5
(42)
Which of the following would NOT NORMALLY be considered for a testing role on a project?
(Multiple Choice)
4.9/5
(42)
Which statement about combinations of inputs and preconditions is true for a large system?
(Multiple Choice)
4.8/5
(40)
Which of the following activities would improve how a tool is deployed within an organization? a) Defining best practice guidelines for users. b) Roll out the tool across the organization as quickly as possible to all users. c) Provide technical support to the test team for each type of tool. d) Introduce a system to monitor tool usage and user feedback. e) Ensure that the test process is not changed as result of the tool introduction.
(Multiple Choice)
4.9/5
(29)
Which of the following test activities are more likely to be undertaken by a test lead rather than a tester? a) Create test specifications. b) Schedule tests. c) Define metrics for measuring test progress. d) Prepare and acquire test data.
(Multiple Choice)
4.9/5
(35)
Which one of the following is true of software development models?
(Multiple Choice)
4.9/5
(40)
Showing 81 - 98 of 98
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)