Exam 15: Lean and Six Sigma Management and Leading Change
Exam 1: Introduction to Supply Chain and Operations Management67 Questions
Exam 2: Supply Chain and Operations Strategy80 Questions
Exam 3: Product and Process Design and Mapping89 Questions
Exam 4: Service Design96 Questions
Exam 5: Customer Relationship Management52 Questions
Exam 6: Strategic Sourcing78 Questions
Exam 7: Supplier Management59 Questions
Exam 8: Demand Management and Forecasting75 Questions
Exam 9: Inventory Management Fundamentals and Independent Demand84 Questions
Exam 10: Sales and Operations Planning and Enterprise Resource Planning110 Questions
Exam 11: Logistics94 Questions
Exam 12: Project Management90 Questions
Exam 13: Supply Chain Quality Management84 Questions
Exam 14: Statistical Process Control74 Questions
Exam 15: Lean and Six Sigma Management and Leading Change76 Questions
Select questions type
The kanban card that has a requisition for parts or components is called the ________ card.
Free
(Short Answer)
4.9/5
(29)
Correct Answer:
supplier
Specially trained individuals in advanced quality tools who perform Six Sigma projects are known as ________.
Free
(Short Answer)
4.8/5
(33)
Correct Answer:
black belts
The Japanese term for continuous improvement is kaizen.
Free
(True/False)
4.7/5
(35)
Correct Answer:
True
A lean method that gives employees the authority to stop the production line when a problem has occurred that triggers a machine stop is known as ________.
(Short Answer)
4.9/5
(38)
What is value analysis and value engineering? What is its role in the lean philosophy?
(Essay)
4.9/5
(35)
Which type of kanban card usually contains bill of materials information for incoming parts or components?
(Multiple Choice)
4.8/5
(41)
Specially trained individuals in advanced quality tools who perform Six Sigma projects are known as green belts.
(True/False)
4.8/5
(32)
Which type of kanban card is used to transport parts from one location to another?
(Multiple Choice)
4.7/5
(29)
Fast improvement focussing on a finite problem is known as ________.
(Short Answer)
4.9/5
(29)
In a production plant,800 parts per day are needed.A standard container holds 100 parts.It takes half a day to receive parts once the move card is released.A safety stock of 100 parts is usually maintained.What is the number of kanban cards needed?
(Multiple Choice)
4.8/5
(35)
As per the Risk and Return evaluation matrix for Six Sigma projects,projects that are low hanging fruit have a
(Multiple Choice)
4.9/5
(37)
The task of implementing process changes will be performed in which phase of the Six Sigma DMAIC process?
(Multiple Choice)
5.0/5
(27)
A person trained in basic quality tools related to Six Sigma projects is known as a ________.
(Short Answer)
4.8/5
(29)
The practice of "producing a little bit of everything,everyday" attained by making setup times short is known as ________.
(Short Answer)
4.8/5
(34)
What are the seven wastes identified by Shigeo Shingo's in a process?
(Essay)
4.8/5
(36)
The task of selecting process outcomes will be performed in which phase of the Six Sigma DMAIC process?
(Multiple Choice)
4.9/5
(28)
Showing 1 - 20 of 76
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)