A system has 4 components in series,each having a reliability of 0.8.What is the reliability of the system?

Free
(Multiple Choice)
4.8/5
(32)
Correct Answer:
Verified

D

Goods that use similar technologies that can coexist in a family of products are known as substitute products.

Free
(True/False)
4.8/5
(43)
Correct Answer:
Verified

False

In Muther's grid the Symbol "U" represents ________.

Free
(Short Answer)
4.9/5
(38)
Correct Answer:
Verified

Unimportant

A production manager wants to design an assembly line that will turn out 800 widgets per day.There will be eight working hours in each day.What is the optimum cycle time?

(Multiple Choice)
4.8/5
(45)

The difference between basic research and applied research is that applied research

(Multiple Choice)
4.8/5
(39)

Concurrent engineering involves performing the different tasks of design

(Multiple Choice)
4.8/5
(34)

A manufacturer of detergent enhances their product offering by introducing new scents of their product.This is an example of which kind of R&D?

(Multiple Choice)
4.7/5
(43)

Process design is

(Multiple Choice)
4.7/5
(40)

A computer manufacturer designs their product such that it is easy for consumers to upgrade product components like the memory in the future at a reasonable cost.This is an example of

(Multiple Choice)
4.8/5
(38)

The ""uptime"" or proportion of time that a product or system functions properly is called ________.

(Short Answer)
4.8/5
(36)

Use the information below to answer the following question(s). A small automotive parts manufacture is evaluating opening a new manufacturing plant for assembly of its battery chargers line. The location being considered has a monthly fixed cost of $42,000 and a variable cost of $3 per charger. Chargers sell for $ 7 each. -The other option (in addition to the option of opening a new manufacturing plant)being considered is subcontracting the work to an external vendor.This option has a monthly fixed cost of $6,000 and a variable cost of $5 per charger.Chargers continue to sell for $7 each.What is the break-even point for the subcontracting option in units per month?

(Multiple Choice)
4.9/5
(34)

Concurrent engineering involves performing the different tasks of design sequentially.

(True/False)
4.9/5
(43)

The cycle time in a production line is determined by

(Multiple Choice)
4.8/5
(29)

Research and Development (R&D),which involves continuous development that takes existing products and enhances them to reinvigorate the product life cycle,is called ________.

(Short Answer)
4.7/5
(30)

Kodak's design of their FunSaver camera so that it snaps apart easily is an example of (choose two)

(Multiple Choice)
4.8/5
(44)

The process of designing products that are enhancements to existing products is known as ________.

(Short Answer)
4.8/5
(30)

In a process map,a diamond symbol indicates

(Multiple Choice)
4.9/5
(28)

The benefits of flexible manufacturing systems (FMS)include

(Multiple Choice)
4.8/5
(28)

In a process map,the diamond symbol indicates that ________.

(Short Answer)
4.7/5
(36)

Comparing various process options and their relationship to volume and variety can be accomplished using