Exam 23: Theory of Constraints

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

According to the theory of constraints, a non-bottleneck is any resource where capacity is less than the demand placed on it.

(True/False)
4.7/5
(39)

Rather than try to adjust the master production schedule to change resource loads, it is more practical to control the flow at each bottleneck or CCR to bring capacities in line.

(True/False)
4.8/5
(41)

In a process sequence where a product flows from process A to process B, process B is called the dependent process.

(True/False)
4.9/5
(27)

An MRP system can allow for product rejects by building a larger batch than is demanded, but a JIT system cannot tolerate poor quality.

(True/False)
4.8/5
(37)

Which of the following is one of Dr.Eli Goldratt's rules of production scheduling for optimized production technology?

(Multiple Choice)
4.9/5
(34)

In a process sequence where a product flows from process A to process B, process A is called the mother process.

(True/False)
4.8/5
(35)

According to the theory of constraints, which of the following is an operational measurement that can be used to measure the firm's ability to make money?

(Multiple Choice)
4.8/5
(43)

According to the theory of constraints, which of the following is a kind of time that makes up the cycle time in production?

(Multiple Choice)
4.9/5
(29)

According to the theory of constraints, which of the following can be a CCR?

(Multiple Choice)
4.7/5
(38)

JIT requires work-in-process when used with kanban so there is inventory to pull.When compared to synchronous manufacturing, this is viewed as a negative aspect of JIT.

(True/False)
4.9/5
(42)

In a process sequence where a product flows from process A to process B, process B is called the contingent process.

(True/False)
4.8/5
(29)

According to the theory of constraints, throughput is the rate at which money is generated by the system through sales.

(True/False)
4.8/5
(32)

Smaller transfer batches give lower work-in-process inventory and faster product flow.

(True/False)
4.7/5
(38)

A process batch should be no larger than the transfer batch.

(True/False)
4.8/5
(33)

On an assembly line, a process batch can be infinite.

(True/False)
4.8/5
(41)
Showing 41 - 55 of 55
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)