Exam 23: Theory of Constraints
Exam 1: Introduction72 Questions
Exam 2: Strategy50 Questions
Exam 4: Project Management72 Questions
Exam 3: Design of Products and Services53 Questions
Exam 5: Strategic Capacity Management57 Questions
Exam 6: Learning Curves55 Questions
Exam 7: Manufacturing Processes41 Questions
Exam 8: Facility Layout55 Questions
Exam 9: Service Processes61 Questions
Exam 10: Waiting Line Analysis and Simulation70 Questions
Exam 11: Process Design and Analysis53 Questions
Exam 12: Six Sigma Quality69 Questions
Exam 13: Statistical Quality Control63 Questions
Exam 14: Lean Supply Chains71 Questions
Exam 15: Logistics Distribution, and Transportation55 Questions
Exam 16: Global Sourcing and Procurement66 Questions
Exam 17: Enterprise Resource Planning Systems45 Questions
Exam 18: Forecasting90 Questions
Exam 19: Sales and Operations Planning61 Questions
Exam 20: Inventory Management102 Questions
Exam 21: Material Requirements Planning83 Questions
Exam 22: Workcenter Scheduling61 Questions
Exam 23: Theory of Constraints55 Questions
Exam 24: Health Care60 Questions
Exam 25: Operations Consulting53 Questions
Select questions type
According to the theory of constraints, a non-bottleneck is any resource where capacity is less than the demand placed on it.
(True/False)
4.7/5
(39)
Rather than try to adjust the master production schedule to change resource loads, it is more practical to control the flow at each bottleneck or CCR to bring capacities in line.
(True/False)
4.8/5
(41)
In a process sequence where a product flows from process A to process B, process B is called the dependent process.
(True/False)
4.9/5
(27)
An MRP system can allow for product rejects by building a larger batch than is demanded, but a JIT system cannot tolerate poor quality.
(True/False)
4.8/5
(37)
Which of the following is one of Dr.Eli Goldratt's rules of production scheduling for optimized production technology?
(Multiple Choice)
4.9/5
(34)
In a process sequence where a product flows from process A to process B, process A is called the mother process.
(True/False)
4.8/5
(35)
According to the theory of constraints, which of the following is an operational measurement that can be used to measure the firm's ability to make money?
(Multiple Choice)
4.8/5
(43)
According to the theory of constraints, which of the following is a kind of time that makes up the cycle time in production?
(Multiple Choice)
4.9/5
(29)
According to the theory of constraints, which of the following can be a CCR?
(Multiple Choice)
4.7/5
(38)
JIT requires work-in-process when used with kanban so there is inventory to pull.When compared to synchronous manufacturing, this is viewed as a negative aspect of JIT.
(True/False)
4.9/5
(42)
In a process sequence where a product flows from process A to process B, process B is called the contingent process.
(True/False)
4.8/5
(29)
According to the theory of constraints, throughput is the rate at which money is generated by the system through sales.
(True/False)
4.8/5
(32)
Smaller transfer batches give lower work-in-process inventory and faster product flow.