Exam 5: Project Management: Planning, Design, and Construction

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Considerations for site selection include all of the following EXCEPT:

Free
(Multiple Choice)
4.8/5
(42)
Correct Answer:
Verified

D

Create a groundbreaking task timeline for a new multipurpose recreation facility in your hometown by creating a Gantt Chart with Microsoft Project or another project management software.

Free
(Essay)
4.9/5
(31)
Correct Answer:
Verified

Below is an example of a groundbreaking timeline. Students should build this into a Gantt Chart using Microsoft Project or another project management software.
3 Months:
\bullet Touch base with local media you want at event
\bullet Find MC for event and make reservation with them
\bullet Contact your preferred speakers for event day (preferably 3-4 speakers)
\bullet Design signage and banners; choose company to print
2 Months:
\bullet Create invitation list of people you want to attend the event
\bullet Create and send out invitations to everyone that you want to attend the event
\bullet Secure Photographer
\bullet Find a caterer for the event (A main sponsor partnering on this event would be ideal)
\bullet Contact rental company for tents, tables, chairs, and any other necessary equipment
3 to 4 Weeks:
\bullet Create program for event day
\bullet Create press release to be sent out one week prior to event
\bullet Confirm with local media you want at the event
\bullet Confirm date and time of event with guest speakers
\bullet Follow-up with caterer for event date and time
\bullet Confirm photographer for event date and time
\bullet Call guests who have not RSVP to the event
1 to 2 weeks:
\bullet Send out press release
\bullet Create new press release to be sent directly after event
\bullet Follow-up with rental company with date and time of event
\bullet Call all guests who have RSVP to remind them of event
\bullet Meet with guest speakers to discuss topics for their speeches
\bullet Finalize information about the facility to be handed out at the ground breaking
Post Event:
\bullet Create and send out thank you notes to all guests
\bullet Evaluate the success of ground breaking ceremony
\bullet Put together pictures for the website
\bullet Follow-up with potential sponsors that attended the event

Which of the following statements about timelines is TRUE?

Free
(Multiple Choice)
4.7/5
(24)
Correct Answer:
Verified

B

Which of the following is NOT the responsibility of an architect?

(Multiple Choice)
4.8/5
(39)

You have been charged with developing a cost estimate for a renovation to a 50-year old local recreation facility that includes four multipurpose courts, a fitness center, and a swimming pool/aquatic center. What would you include in this estimate?

(Essay)
4.9/5
(30)

What type of chart listed below is typically designed through the use of project management software?

(Multiple Choice)
4.8/5
(34)

The first step in any preliminary planning is:

(Multiple Choice)
4.9/5
(42)

Define what would be involved in conducting a feasibility study for a new football facility in a suburban town of your choice.

(Essay)
4.9/5
(32)

Develop a program statement for a new golf course.

(Essay)
4.7/5
(42)

Throughout the construction process, and especially when construction is nearing completion, the focus turns to the management and operation of the sport facility. Included in this process is all of the following EXCEPT:

(Multiple Choice)
4.9/5
(35)

When conducting a feasibility study, which of the following impacts is considered?

(Multiple Choice)
4.8/5
(42)

The principles of project management include all of the following EXCEPT:

(Multiple Choice)
4.8/5
(43)

The ________________ is used to review the major components of the project, market the project to gain financial and general support for the project, and serve as a framework document for the design and construction of the sport facility.

(Multiple Choice)
4.8/5
(33)

Which of the following is TRUE about the creation of detailed shop drawings for a facility?

(Multiple Choice)
4.9/5
(28)
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)