Exam 13: Systems Development: Construction, Integration and Testing, Implementation, Operation an

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Only internal employees can perform systems review.

(True/False)
4.8/5
(34)

Testing that ideally forces an individual program to execute all of its various functions and user features is known as _____.

(Multiple Choice)
4.9/5
(23)

User acceptance testing (UAT) is a critical activity that must be completed successfully before newly developed software can be rolled out to the market.

(True/False)
4.9/5
(34)

_____ is an approach to writing code that promotes incremental development of a system using short development cycles to improve productivity and to accommodate new customer requirements.

(Short Answer)
4.7/5
(36)

_____ is the creation, modification, or extension of software by people who are nonprofessional software developers.

(Multiple Choice)
4.9/5
(30)

The _____ specifies the factors that can lead to better attitudes about the use of a new information system, along with its higher acceptance and usage.

(Short Answer)
4.8/5
(37)

For a small system, site preparation can be as simple as rearranging the furniture in an office to make room for a computer.

(True/False)
4.9/5
(26)

_____ involves linking all individual components together and testing them as a group to uncover any defects between individual components.

(Short Answer)
4.9/5
(33)

_____ consists of written descriptions developed for people who use a program.

(Multiple Choice)
4.8/5
(40)

What is meant by cutover? Briefly explain four cutover strategies.

(Essay)
4.8/5
(36)

Software as a Service (SaaS) allows individuals and organizations to access needed software applications over the Internet.

(True/False)
4.8/5
(36)

A new _____ is a significant program change that often requires changes in the documentation of the software.

(Short Answer)
4.9/5
(33)

The _____ is an iterative systems development approach developed by IBM that includes a number of tools and techniques that are typically tailored to fit the needs of a specific company or organization.

(Short Answer)
4.8/5
(31)

_____ is the process of analyzing systems to make sure they are operating as intended.

(Short Answer)
4.9/5
(41)

Even if unit testing is successful, developers cannot assume they can combine individual components into a working system without any problems.

(True/False)
4.9/5
(30)

_____ is a stage of systems development that involves changing and enhancing the system to make it more useful in achieving user and organizational goals.

(Short Answer)
4.9/5
(36)

Which of the following statements is true of user acceptance testing (UAT)?

(Multiple Choice)
4.8/5
(36)

Briefly explain the difference between system testing and user acceptance testing (UAT).

(Essay)
4.8/5
(40)

In the system construction phase, determining the specific equipment needed, ordering the equipment, and receiving the equipment require a short lead time.

(True/False)
4.8/5
(36)

A _____ is a critical date for completing a major part of a project, such as program design, coding, testing, and cutover.

(Multiple Choice)
5.0/5
(41)
Showing 61 - 80 of 85
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)