An example of an intangible benefit is

Free
(Multiple Choice)
4.8/5
(29)
Correct Answer:
Verified

C

A tangible benefit can be measured and expressed in financial terms.

Free
(True/False)
4.8/5
(41)
Correct Answer:
Verified

True

Describe a test of controls that would provide evidence that only authorized program maintenance is occurring.

Free
(Essay)
4.8/5
(33)
Correct Answer:
Verified

reconcile program version numbers, confirm maintenance authorizations

Which statement is not correct? The structured design approach

(Multiple Choice)
4.9/5
(36)

A commercial software system that is completely finished, tested, and ready for implementation is called a

(Multiple Choice)
4.9/5
(40)

Programs in their compiled state are very susceptible to the threat of unauthorized modification.

(True/False)
4.9/5
(37)

Intangible benefits

(Multiple Choice)
4.7/5
(36)

Maintenance access to systems increases the risk that logic will be corrupted either by the accident or intent to defraud.

(True/False)
4.8/5
(34)

When determining the operational feasibility of a new system, the expected ease of transition from the old system to the new system should be considered.

(True/False)
4.8/5
(38)

Typical contents of a run manual include all of the following except

(Multiple Choice)
4.9/5
(40)

Examples of one-time costs include all of the following except

(Multiple Choice)
4.9/5
(43)

The benefits of the object-oriented approach to systems design include all of the following except

(Multiple Choice)
4.7/5
(41)

Which step is least likely to occur when choosing a commercial software package?

(Multiple Choice)
4.7/5
(36)

Which task is not essential during a data conversion procedure?

(Multiple Choice)
4.8/5
(32)

When developing the conceptual design of a system,

(Multiple Choice)
4.8/5
(33)

Contrast the source program library (SPL) management system to the database management system (DBMS).

(Short Answer)
4.9/5
(47)

A cost-benefit analysis is a part of the detailed

(Multiple Choice)
4.7/5
(34)

The detailed design report contains all of the following except

(Multiple Choice)
4.7/5
(36)

Strategic systems planning is important because the plan

(Multiple Choice)
4.9/5
(37)

Define the feasibility measures that should be considered during project analysis and give an example of each.

(Essay)
4.8/5
(35)